Written by Sander Houston

Floods continue to affect wide areas of Zambia. An Early Action Protocol (EAP) aims to mitigate the impact of predicted floods by enabling the release of funding to execute pre-agreed early actions before the flood (a mechanism called Forecast Based Financing).

In the words of Mulambwa Mwanangono, the previous disaster manager of Zambia Red Cross: ‘Anticipation lives on Data, Forecast Based Financing is a function of Data’. Disaster managers need an analysis of the impact of previous floods as understanding what happened in the past is the key to forecasting the possible impacts of future events and planning actions accordingly. Based on historical (hydrometeorological and impact) data, we aim to develop effective flood forecasts and warnings. Forecasts provide a time window of opportunity that enables a proactive approach in which Early Actions can be carried out. Zambia Red Cross Society (ZRCS) performed the first light activation after the الاتحاد الدولي لجمعيات الصليب الأحمر والهلال الأحمر approved the protocol at the end of 2020. Since all activities needed for a full activation of the EAP had not been implemented yet  we call this a light activation,

This blog shares insights from the flood light activation in Zambia that took place from February 18th until February 24th 2021.

Background on the Impact Based Forecasting (الاتحاد الدولي للملاكمة) Portal and Early Action Protocol (EAP)
ZRCS worked with the 510 data & digital team at the Netherlands Red Cross to analyze and visualize data needed to support operational decisions during the anticipatory actions.  ZRCS data analysis is integrated within 510’s Impact Based Forecasting (IBF) Portal.  This is an operational decision-making support tool developed to integrate data and visualize the impact a disaster will have. ‘The IBF Portal was operationally used during the activation to visualize and disseminate information that supported the operational decision making of disaster managers’, said Stefania Giodini (team lead of 510). A trigger model, which is used in the portal, is developed to determine at what threshold the Early Action Protocol (EAP) should be activated. The trigger model, also developed in collaboration with 510, is based on the water discharge threshold that corresponds to a 20-year return period flood. When asked about the importance of the IBF Portal Zaitun Munawar (former Program Delegate at ZRCS) said: ‘the IBF portal supports a National Society in a more proactive approach by giving it time to implement early actions’. She continues by saying that ‘by doing so we can reduce the impact on communities and properties’. The EAP is developed collaboratively with all organizations and communities involved to decide on what appropriate anticipatory actions to undertake. ‘This for example includes informing the communities, evacuation of residents, and distribution of water purifying tablets’. Read more about the IBF Portal here.

Organizations involved
ال Red Cross Red Crescent Climate Centre provided and played a key facilitation role in the development of the EAP. The Forecast based Action by the DREF, a pool of funds managed at global level by the IFRC to support the activation of EAP, validated the EAP through its validation committee last December and provides funding for the Zambia Red Cross Society (ZRCS) to perform readiness, prepositioning, and the required anticipatory actions included in the EAP once it is activated. This time, since all activities needed for a full activation of the EAP had not been implemented yet, only part of the EAP was activated. T The development of the floods EAP as such, and the simulation exercise to test the EAP is part of a bigger program called Response Preparedness II (RPII funded by the Dutch Ministry of Foreign Affairs ), coordinated by the NLRC and its data & digital team 510 together with the Red Cross Red Crescent Climate Centre. Similar work is taking place in Mali (through the same program) as well as in Ethiopia, Uganda, and Kenya (through the Innovative Approaches to Response Preparedness (IARP) funded by IKEA Foundation), where early warning/early action systems are developed by the host national societies. The local government sectorial offices contributed to both the EAP development as well as light activation. The Disaster Management and Mitigation Unit (DMMU), Global Flood Awareness System (GLOFAS), Water Resources Management Authority (WARMA), و Zambia Meteorological Department (ZMD) also provided technical support.

Activating the Early Action Protocol
When Clayton Lumwaya (نظم المعلومات الجغرافية Specialist at ZRCS) was asked about the experience with the activation of the flood trigger he said: ‘we have not experienced this amount of rainfall in quite a long time. When the trigger level was reached, the IBF Portal sent an automatic message to the Disaster Management and Mitigation Unit (DMMU).’- DMMU is the governmental stakeholder that provides leadership and coordination in the adoption and implementation of Forecast-based Financing.  Clayton continued by saying: ‘When the system showed the risk of floods in the districts we immediately informed all stakeholders and looked into the alert’. His colleague, Wina Wina (Disaster Manager at ZRCS), added: ‘Once we validated the alert the Early Action Protocol could be activated’.

According to Malika Noisette (Response preparedness technical advisor at The Netherlands Red Cross), there were two concerns when activating the Early Action Protocol. The first one being that ‘the ZRCS branch of the area covered by the trigger was not fully equipped yet and therefore not ready to implement all the Early Actions’. The second one was that ‘according to current procedures of the FbA by the DREF, it’s not possible to activate the EAP twice within one season. The rainy season begins in the middle of November and lasts until April. This was a concern since a flood with a higher impact was expected to occur later on in the season and Zambia Red Cross wanted to keep the chance to utilise the FbA by the DREF funds to activate their Early Action Protocol later on, should a bigger trigger be reached in March or April’. Therefore, NLRC looked for internal funds to ensure that this activation takes place while reserving the IFRC’s fund for a potential bigger activation.

Field activities day by day
Day 1 & 2
An intervention area map, which shows the areas where the impact of the flood is expected to happen, was provided via the IBF Portal. The early warning committee was then informed in order to conduct a field study in those areas that would be critically impacted. This way it was possible to contextualize the information of the trigger to the reality on the ground, which is used to determine relevant anticipatory actions. A recommendation was then drafted for all parties involved. Urgent meetings were held to evaluate the situation and options. The available stock was checked along with if the early action activities were ready to be activated. A government letter was sent to inform them that an alert message was received and to ask for the go-ahead to activate the protocol.

Day 3 & 4
The local government was engaged after which clearance from them to continue with the light activation was received. A quick flood assessment was conducted on the ground to determine the flood extent, vulnerabilities, and beneficiaries in conjunction with the DMMU.

Day 5, 6 & 7
The logistics were mobilized and the implementation team assembled. Early actions were executed as the rain continued to fall. Communities were informed on the risk of floods and given information about healthy sanitation practice and safe upland areas. Focus group discussions were conducted in the community and with stakeholders to understand the needs and perceptions of the communities. The flood started on February 24th.

Day 8 – 12
The emergency response phase started after the flood happened.
This included the distribution of Non-Food Ito people affected by the flood.

   
Displacement of households                              Submersion of crops

   
Destruction of shelter                                          Destruction of access routes

What did we learn from the activation?

  • It is important to consider alternative funding sources than FbA by the DREF when preparedness activities are not finalized in the disaster areas. Because of the previous collaboration in place, ZRCS and NLRC were able to mobilize resources very fast, but this should be a conversation to have with partners before any activation.
  • It was observed that even if preparedness activities were not finalized in the area of intervention, ZRCS could still manage to reposition its stock and mobilize staff and volunteers rapidly.
  • Too much time was spent waiting for governmental approval for deployment of actions in the intervention area. Pre-approvals need to be in place for quick processing when the EAP is activated.
  • Better collaboration with Ministry of Health, Education, and Agriculture is needed. Especially to expand the capacity of ZRCS reach in the wards where no volunteers are available but coordination structures may already be in place by these ministries, which could be utilised.
  • Stakeholders who are initiating the activation should be ready to act before reaching the maximum alert threshold (for example between an 80% to 100% chance of the flood happening) to avoid delay in implementing early actions.


القيمة المضافة للعمل مع خبراء البيانات عند إعداد التمويل القائم على التوقعات

شاركت 510 في تصميم وتطوير بوابة IBF وتدعم الجمعية الوطنية في رحلة الاستعداد للبيانات. وبالتعاون مع الصليب الأحمر الزامبي وفريق البيانات التابع له، بدأت 510 تحليل البيانات اللازم لتطوير بروتوكول العمل المبكر. أثبتت بوابة IBF أنها أداة حاسمة لنشر المعلومات بين أصحاب المصلحة. فهي تعمل كنقطة لقاء لمديري الكوارث من جمعية الصليب الأحمر الزامبي والوكالات الحكومية لاستشارة البيانات ومشاركة المعلومات وخطط العمل وتنسيق الاستجابة. يوضح جيوديني: "كنا نعلم أيضًا أنه يوجد دائمًا مجال للتحسينات وكانت هذه مناسبة رائعة للتعلم: نعلم الآن على سبيل المثال أننا بحاجة إلى تصور الأجنحة على الخريطة حتى يتمكن مدير الكوارث من تحديد أي منها يجب تنبيهه وأننا يجب أن نظهر الارتفاع حتى يمكن تحديد الأماكن المنخفضة بسهولة".

الخطوات التالية
ستنفذ شركة 510 الآن ملاحظات المستخدم من هذا التنشيط التجريبي لتحديث بوابة IBF. بعد ذلك، سيتم تسليم لوحة التحكم التشغيلية إلى وحدة التخفيف من الكوارث وإدارتها في زامبيا وسيتمكن جميع أصحاب المصلحة من الوصول إليها وفقًا لولايتهم. ستواصل شركة 510 دعم زامبيا أثناء انتقالها نحو إدارة المخاطر المتعددة نظام الإنذار المبكر وهذا يشمل أيضًا توقع الجفاف. وتضيف نوازيت قائلة: "حقيقة أننا تمكنا من القيام بذلك في زامبيا لا تعني أنه يمكننا القيام بذلك تلقائيًا في أي بلد في أي وقت. نحن بحاجة إلى التعلم من هذا النجاح والتأكد من تحويله إلى طريقة عمل مستدامة. ومن الأمثلة على ذلك تشكيل فريق منسق من خبراء NLRC و 510 بإجراءات تشغيلية قياسية واضحة، ومتاحين دائمًا للعمل معًا في دعم جمعياتنا الوطنية الشقيقة في اتخاذ القرارات السريعة، في أوقات التنبيهات والطوارئ".

مصدر الصورة: جمعية الصليب الأحمر الزامبي

إن المعلومات ذات الصلة بالأفراد والمجتمعات المحتاجة يمكن أن تكون مفيدة في تقديم مساعدات إنسانية فعّالة ومخصصة. وتتناول سياسة مسؤولية البيانات لدينا معالجة البيانات بشكل مسؤول فيما يتعلق بالمعايير الأخلاقية والمبادئ في السياق الإنساني، مع وضع العواقب المحتملة في الاعتبار واتخاذ التدابير اللازمة لتجنب تعريض الأفراد أو المجتمعات للخطر. اقرأ المزيد عن سياسة مسؤولية البيانات الخاصة بنا هنا